General aspects
Client: | Portland Trust |
Constructor: | Strabag |
Project Management: | Optim Project Management |
Location: | Soseaua Pipera 44, Disctrict 2, Bucharest, Romania |
Decor Floor: | Floor finishes supplier |
Amenities: | ATM, Medical Centers, Fitness Club, Cafes & Restaurants |
Decor Floor executed works: |
|
Building B: | 20.000 SQM Raised Access Floor |
Building A: | 24.000 SQM Raised Access Floor |
Oregon Park has been designed to provide a combination of high specification, efficient office space with a particular focus on low energy consumption and ecology. The buildings are designed in accordance with BREEAM recommendations which will ultimately assess Oregon Park based upon attention to: health and wellbeing of workers, energy efficiency, transport, use of water, waste treatment, use and sourcing of construction materials and ecological use of the land.
The project is envisaged to provide three independent office buildings, all built over two basement car parking levels, ground and six upper floors, up to 3440 sqm office space per floor.
Oregon Park was awarded in 2017, at the Outsourcing Gala with the Best Office Development for BPO/SSC sector in Bucharest award. This award recognizes the top office development in Bucharest that offers healthy, enjoyable and productive places to work.
During March – September 2016 Decor Floor delivered and installed 44.000 sqm of JVP raised access floor, JVP 4×4 C3TTL000 – woodcore panel full encapsulated in steel sheet of 5mm.
Compared to competition products, JVP had a much better product with life expectation of 25 years, all certifications and quality documentation, being a BREEAM certified product with higher technical performances. The load bearing capability was surely one of the most important technical factors considered when chosen JVP raised access floor system. It determines the future use of the floor surface which is intrinsically linked to the building’s proposed activities.
JVP complies with the European Directive 106 referring to building construction and components.
The raised access floor was used as a normal component of the building construction in order to have the proper flexibility of the building and the possible implementation of new technology in the future.
For the investors and the builders, it was an advantage to economically postpone the costs of the covering material. The financial impact of the cash out and the warranty to supply a space can secure a decent return of investment and an easy allocation of the space to different type of tenants.
For the tenants the possibility to rent a space with the advantage to decide the type and quality of covering without detriment to the function of the system used was a great big advantage.
Building A was completely rented to Oracle, while Building B it’s a multi-tenanted property, almost entirely leased to tenants such as Deloitte, Europa FM, Euler Hermes, or BCR. Our commercial carpet brands and hard surface flooring solutions offered a full range of flooring choices for these tenants.
Tenant | Product delivered & installed | Surface contracted/ sqm | Interior Design | Year | |
Building B | Euler Hermes | Desso carpet, Neo, Stratos & Stratos Blocks | 1500 | Techo Romania | 2017 |
Deloitte | Milliken carpet, FormworkGerflor Luxury Vinyl Tiles, Creation 55Gerflor vinyl, Mipolam Accord ELNora rubber, Noraplan UNI | 3300 | Prographic Architecture Studio | 2017 | |
Europa FM | Desso carpet, Airmaster Sphere Milliken carpet, Arctic Survey & Light Trails | 1250 | 1722 StudioLab | 2017 | |
Portland Trust | Milliken carpet, JuxtaposeGerflor Luxury Vinyl Tiles, Creation 55 | 180 | Waltmann Architecture | 2017 | |
BCR Branch | Desso carpte, AirmasterFloorgres ceramics, ChromtechMirage ceramics, Signature | 75 | Erste Group | 2017 | |
Building A | Lobby | Neolith Ceramics | 20 | Techo Romania | 2017 |